Cinnabar, Ottawa – Basement Bathroom

Basement Bathroom Renovation – Cinnabar, Ottawa. On this project our client chose and supplied all of the fixtures. This basement bathroom included roughing in water supply lines to all new fixtures, moving the pre-roughed in shower drain location in the concrete floor to accomodate the drain location of new shower base being installed. Built small wall to close in shower and hold shower faucet plumbing and built shelves on opposite side. Built bulkhead around venting duct that ran through the bathroom. Rough-in and install a new bathroom fan. Installed shower base, shower faucet, tiled the shower walls and installed new shower doors. Installed new toilet, vanity, countertop/sink, sink faucet, vanity light and mirror. Once all complete we finished it off with fresh paint.

 

Marie-Mackenzie-Completed-11-710x1262 Marie-Mackenzie-Completed-1-710x1262 Marie-Mackenzie-Completed-13-710x1262 20131005_173545-710x1262 Marie-Mackenzie-Before-pics-2-710x947