Coronation Drive, Ottawa

Basement Bathroom Renovation – Coronation Drive, Ottawa – During this renovation we tore out the old tile shower walls and floor, removed all of the rotted framing, rebuilt a frame to hold the new shower base, installed water-proof membrame on shower floor and up the walls, built a sloped shower floor, replaced shower faucet, installed cement board on shower walls, installed new tile on shower walls and shower floor. White Corian shower sill was installed for much better stain resistance than marble. The concrete bathroom floor was smoothed over and tiled. Two weeks later a clear custom glass shower door was installed (Custom glass doors are measured for manufacturing only once the tile work is all completed and usually take 2-4 weeks to manufacture).